Enjoy FREE GROUND SHIPPING on standard-sized orders $349.99+ *SALE ENDS SOON*
INDUSTRY-LEADING TURNAROUND TIMES—ALL PRINTING AND PANEL MANUFACTURING IS COMPLETED IN-HOUSE
SKU:
Adding product to your cart
Install acoustic panels securely and perfectly level with our professional Z-clip mounting system. This heavy-duty interlocking hardware kit is the same style used in commercial acoustic installations worldwide. Designed for wall or ceiling mounting, these improved galvanized steel Z-clips provide rock-solid support for acoustic panels of nearly any size or weight.
Each complete kit includes everything needed for professional acoustic panel installation: clips and screws.
Z-Clips – Interlocking panel-side and wall-side clip (8) pairs / (16) pcs.
Mounting Screws – Proper fasteners for panel and wall attachment
Drywall Anchors – Secure support for hollow wall installations
Mounting Style: Interlocking Z-Clip (French Cleat System)
Material: Heavy-duty PLA
Weight Capacity: Supports most standard acoustic panels
Wall Compatibility: Drywall, plaster, wood, concrete (anchors may vary)
Ceiling Compatible: Yes
Adjustable: Allows slight horizontal repositioning after hanging
Acoustic panel wall mounting
Ceiling acoustic panel installation
DIY acoustic panel projects
Replacing worn or outdated mounting hardware
Commercial acoustic installations
Z-clips are the preferred mounting system in professional acoustic installations. One clip mounts to the wall, the other to the back of the panel. They interlock securely, distributing weight evenly while allowing easy removal when needed.
The interlocking design ensures panels hang straight every time. Unlike adhesive or screw-through methods, Z-clips provide consistent, professional results.
Need to repaint? Rearranging panels? Moving locations? Z-clips allow easy removal and reinstallation without damaging your panels.
Mount the wall-side clip using included screws and anchors (use a level).
Attach the panel-side clip to the back of the acoustic panel.
Hang the panel by interlocking the clips.
Adjust horizontally for precise positioning.
Most panels install in 5–10 minutes. Only basic tools required (drill/screwdriver and level).
Secure. Level. Easy.
Promotions, new products and sales. Directly to your inbox.
No products in the cart.
Sign up for our newsletter to receive exclusive offers and 10% OFF your first order!